03  /  Rental & service model

Technology packaged with the support model campaigns need.

ETS packages technology with the deployment and support model required by temporary and campaign-based operations.

Six stages

From well data to demobilisation

01

Engineer

Review well data, flow envelope, solids loading, fluids and site constraints before anything is selected.

02

Configure

Select equipment architecture, materials, pressure class, instrumentation and automation.

03

Mobilise

Prepare the rental package, inspection documentation, transport and site integration.

04

Operate

Commissioning, field service, operator support and performance monitoring.

05

Optimise

Use live operating data to improve flush frequency, choke strategy and equipment utilisation.

06

Demobilise

Efficient close-out, inspection, maintenance and readiness for the next campaign.

ETS rental package operating on a well site at night

Field execution

Supported by the team that engineered it

Commissioning, operation, optimisation and maintenance are aligned with campaign needs — not handed off to a third party once equipment is on site.

04 While running

Optimised during the campaign, not after it

Live operating data is used to improve flush frequency, choke strategy and equipment utilisation while the campaign is still running.

Real-time sand accumulation monitoring and automated live flush reduce manual intervention at the wellsite and improve the quality of the decisions made around it.

Next step

Let’s engineer the next field solution.

Tell us the well conditions and the constraint you are working against. We will come back with an equipment architecture, not a catalogue page.